Simple Bites Fraser Street location construction started at 9:00 am on May 24th. 2018. Thank you to Cheung and his co-worker (metal framer/drywaller) showed up on time. Afer a short greeting, the duo team starts carrying in long metal 3-5/8″ studs and tracks. Radio on and work started. There were two errors in floor plan drawings required Cheung’s team to take down what they built and make the correction. Luckily Cheung’s team was experienced enough to detect trouble earlier. The first day was a great start.